The Family Health Center includes physician offices and a pharmacy located on the campus of DENSO Manufacturing of Tennessee.
Location
Key features of this project include a pervious paver parking lot with underground detention, an EIFS exterior designed to imitate stone and brick, conventional steel framing, and emergency generators.
![Family-Health-Center-solid-sky-3-1024x775.jpg](https://static.wixstatic.com/media/773d3a_eeedc0579a544c8c89c237a25f404609~mv2.jpg/v1/fill/w_374,h_283,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Family-Health-Center-solid-sky-3-1024x775.jpg)
![Framers_DensoFHC.png](https://static.wixstatic.com/media/773d3a_4e99229d643a4fe189a7cfcf628f8987~mv2.png/v1/fill/w_378,h_252,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/Framers_DensoFHC.png)
Completed Ahead of Schedule
The time frame to complete this project originally was 158 days and was completed in 142 days.
Exterior
By using a pervious paver parking surface and underground detention, available land was conserved for future use by eliminating a detention pond. Finestone EIFS products allowed the architectural look of brick and stone at a lower cost, a more efficient building envelope, and faster installation time.